길 검색

주소를 입력하고 검색 버튼을 클릭하면 루트가 표시됩니다.

이메일 주소 :   

등록내용

  • [등록자] : City of Seattle
  • [언어]日本語
  • [지역]Seattle, WA
  • 등록일 : 2025/07/14
  • 게재일 : 2025/07/14
  • 변경일 :2025/07/14
  • 총열람수 : 44 명
알림

Stay Informed: Admiral Way North and South Bridges Seismic Project

We expect the project to be finished in summer 2025. 



Seattle Department of Transportation logo



*Stay Informed: **Admiral Way North and South Bridges Seismic Project*

Two construction workers wearing safety gear sand and prepare the metal railing on a bridge surrounded by tall trees.

Crews prepare the bridge railing surface, an important first step before painting (July 2025).

*We’re making the Admiral Way North and South Bridges [ https://www.seattle.gov/transportation/projects-and-programs/programs/bridges-stairs-and-other-structures/bridges/sw-admiral-way-bridge-retrofit?utm_medium=email&utm_source=govdelivery ] stronger and less vulnerable in the event of an earthquake. We expect the project to be finished in summer 2025. *

________________________________________________________________________



*What’s Happening Now: What You Need to Know*

*Here’s what the crews are working on:*


* Painting the handrails to protect them and keep them looking great.
* Installing fencing along the east side of the bridge area for added safety.
* Repairing cracks under the bridge deck. While these cracks don’t affect the bridge’s structure, fixing them is important to keep the bridge in good condition and extend its lifespan.

*Upcoming work:*


*

Crews will complete minor repairs to a section of the north handrail.


*

Crews will install a "shear key" —a component that helps prevent movement from seismic forces, such as earthquakes— to improve the bridge’s durability.

*What to expect during construction*

* Crews will work in public areas near homes and businesses.
* Expect construction impacts like noise, dust, vibrations, and equipment on site.
* Typical work hours are 7 AM to 5 PM, Monday through Friday.

*Important Reminders*

*Admiral Way SW (on top of the bridge)  *


* A sidewalk remains open for people walking, biking, and using mobility devices.
* The work zone will change from time to time over the next several weeks, but we’re keeping at least one lane of Admiral Way SW open in each direction.

*Fairmount Ave SW to Remain Closed (below the bridge)*


* Fairmount Ave SW under the bridge will remain closed to people walking, biking, rolling, and driving until the end of construction. This closure keeps everyone safe and helps our crews work efficiently.

________________________________________________________________________



Please share this update with your neighbors and encourage them to sign up for email updates [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/new?qsp=WASEATTLE_8 ] to stay informed.

Thank you,   

Bridge Seismic Retrofit Program Outreach Team
Contact us at: BridgeSeismicRetrofit@seattle.gov_ | _(206) 775-8734 [ https://links-1.govdelivery.com/CL0/tel:%2520%2B1%2520(206)%2520775-8734/1/01000196016dbd21-53253ad5-de00-4657-b8c8-cbccf71e29ea-000000/DkX2inKl4Aon_wcUzewrFhSGl2BVfbW79LqaloZSYjk=399 ]_ 
_Visit our website: Admiral Way North and South Bridges Seismic Retrofit [ https://www.seattle.gov/transportation/projects-and-programs/programs/bridges-stairs-and-other-structures/bridges/sw-admiral-way-bridge-retrofit?utm_medium=email&utm_source=govdelivery ]






*Seattle Department of Transportation*

700 5th Avenue

Suite 3800

Seattle, WA 98104

*Phone: 206-684-7623*

facebook [ https://www.facebook.com/SeattleDOT/?utm_medium=email&utm_source=govdelivery ]front porch [ https://sdotblog.seattle.gov/?utm_medium=email&utm_source=govdelivery ]r s s feed [ https://sdotblog.seattle.gov/feed/?utm_medium=email&utm_source=govdelivery ]twitter [ https://twitter.com/seattledot?utm_medium=email&utm_source=govdelivery ]flickr [ https://www.flickr.com/photos/sdot_photos?utm_medium=email&utm_source=govdelivery ]instagram [ https://www.instagram.com/seattledot/?utm_medium=email&utm_source=govdelivery ]youtube [ https://www.youtube.com/seattledot?utm_medium=email&utm_source=govdelivery ]linkedin [ https://www.linkedin.com/company/seattle-department-of-transportation?utm_medium=email&utm_source=govdelivery ] seattle dot gov

Manage Preferences [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/edit?preferences=true#tab1 ]  |  Unsubscribe [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/one_click_unsubscribe?verification=5.7e4abd93610d77ba0dce3e5196581a5c&destination=mshinji3056%40gmail.com ]  |  Contact Us [ https://www.seattle.gov/transportation/about-sdot/contact-us?utm_medium=email&utm_source=govdelivery ]  |  Help [ https://subscriberhelp.govdelivery.com/ ] |  Privacy [ https://www.seattle.gov/privacy-statement?utm_medium=email&utm_source=govdelivery ]




________________________________________________________________________

This email was sent to mshinji3056@gmail.com using GovDelivery Communications Cloud on behalf of: City of Seattle, Washington · 600 Fourth Avenue · Seattle, WA 98104 GovDelivery logo [ https://subscriberhelp.granicus.com/?utm_medium=email&utm_source=govdelivery ]

body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;}

비비나비 - 지자체소식

프린트한 정보를 사이트에서 보려면 상기 URL 또는 QR코드를 사용해주세요