最新から全表示
-
Notification2024/12/20 (Fri)
Georgetown to Downtown Safety Project update - December 20
Construction update for December 23 - January 10
Seattle Department of Transportation logo
Georgetown to Downtown Safety Project Update
...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Metro Transit Alert - Weekend Trolley Motorization
On Saturday and Sunday, December 21 and 22, Metro trolley routes 1, 3, 4, 7, 10, 14, 36, 43, 44 and 49 will not be motorized.
Routes 2, 12, 13 and 70 will be motorized.
<...- [登録者]King County
- [エリア]King County
-
Notification2024/12/20 (Fri)
Metro Transit Alert - RapidRide E Line trip to Aurora Villag...
RapidRide E Line trip to Aurora Village TC scheduled at 5:24 PM from Prefontaine Pl S & Yesler Way (NB) and five other trips are not operating today.
Affected trips to Auror...- [登録者]King County
- [エリア]King County
-
Notification2024/12/20 (Fri)
Beacon Ave S & 15th Ave S Safety Project Update - December 2...
Construction updates for December 23 - January 10
Seattle Department of Transportation logo
Beacon Ave S & 15th Ave S Safety Project Update
...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Georgetown to South Park Connection Construction Update - De...
Seattle Department of Transportation logo
Georgetown to South Park Connection Update
*Construction on the Georgetown to South Park Safety project began on...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Alaskan Way Safety Project Update - December 20
Seattle Department of Transportation logo
Alaskan Way Safety Project
*Construction on the Alaskan Way Safety project begins on Monday, December 2! *Read m...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Metro Transit Alert - RapidRide D Line trip to Ballard sched...
RapidRide D Line trip to Ballard scheduled at 3:18 PM from Prefontaine Pl S & Yesler Way (NB) and two other trips are not operating today.
Affected trips to Ballard:
to B...- [登録者]King County
- [エリア]King County
-
Notification2024/12/20 (Fri)
The magic of the Seattle Festival of Trees 🎄✨
2024 headlines | The politics of policing | J.P. Patches & Stan Boreson holiday
Seattle Channel logo transparent
City Inside/Out looks back at ...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
KCMEO Decedents List: 12/20/24
View as a webpage [ https://content.govdelivery.com/accounts/WAKING/bulletins/3c896b1 ]
king county medical examiner - seattle and king county public health
King Cou...- [登録者]King County
- [エリア]King County, WA
-
Notification2024/12/20 (Fri)
Press Release: City of Kenmore Adopts 2025-2026 Biennial Bud...
News from the City of Kenmore
press release banner [ https://www.kenmorewa.gov/our-city/city-news ]
*FOR IMMEDIATE RELEASE
*December 20, 2024
C...- [登録者]City of Kenmore
- [エリア]Kenmore, WA
-
Notification2024/12/20 (Fri)
RapidRide J Line Construction News: December 20, 2024
City of Seattle Logo
RapidRide J Line banner
The RapidRide J Line project will bring significant improvements to the University District, Eastlake, South...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Metro Transit Alert - RapidRide H Line trip to Burien TC sch...
RapidRide H Line trip to Burien TC scheduled at 2:20 PM from 3rd Ave & Virginia St (SB) and three other trips are not operating today.
Affected trips to Burien TC:
to Bur...- [登録者]King County
- [エリア]King County, WA
-
Notification2024/12/20 (Fri)
"Missing Link" Bike Route Study 30% Design Outreac...
"Missing Link" Bike Route Study 30% Design Outreach Summary
Seattle Department of Transportation logo
Draft Rendering of Market Stree...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Metro Transit Alert - RapidRide H Line trip to Burien TC sch...
RapidRide H Line trip to Burien TC scheduled at 2:00 PM from 3rd Ave & Virginia St (SB) and three other trips are not operating today.
Affected trips to Burien TC:
to Bur...- [登録者]King County
- [エリア]King County, WA
-
Notification2024/12/20 (Fri)
Construction updates for 15th Ave W/NW
December 20, 2024 Construction update
Seattle Department of Transportation logo
Construction updates for 15th Ave W/NW
December 20, 202...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Invitation to Online Open House for Route 40 Transit-Plus Mu...
Route 40 update, December 20: Holiday update and invitation!
City of Seattle Logo
Route 40 TPMC logo
_______________________________________...- [登録者]City of Seattle
- [エリア]Seattle, WA
-
Notification2024/12/20 (Fri)
Metro Transit Alert Reminder - RapidRide H Line construction...
RapidRide H Line construction alert. Minor curb and sidewalk work is underway through the end of the year along Ambaum Blvd in Burien. No significant travel disruptions are expecte...
- [登録者]King County
- [エリア]King County, WA
-
Notification2024/12/20 (Fri)
Metro Transit Alert - Stop #25752 Montlake Blvd E & E Shelby...
Stop #25752 Montlake Blvd E & E Shelby St (NB) will be permanently closed beginning Saturday, December 21 due to construction. A future stop at the Montlake / SR-520 interchange is...
- [登録者]King County
- [エリア]King County, WA
-
Notification2024/12/20 (Fri)
Bellevue launches Economic Development Plan update
header
*FOR IMMEDIATE RELEASE*: Friday, Dec. 20, 2024
*CONTACT*: Janelle Wetzstein, Public Information Officer, Community Development, 425-452-6599 or jwetzstein@be...- [登録者]City of Bellevue
- [エリア]Bellevue, WA
-
Notification2024/12/20 (Fri)
City of Auburn Traffic Advisory
Auburn, WA [ https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDEsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMjExMjkuNjczNjM0ODEiLCJ1cmwiOiJodHRwOi...- [登録者]City of Auburn
- [エリア]Auburn, WA
詳細は記事に記載されている各自治体にご確認ください。