SDOT in partnership with King County Metro are upgrading the route 70 to a RapidRide level of Service. 

We will be sending regular email updates to keep you informed on what to expect near you. We’ll also be reaching out to neighbors, businesses, and local community organizations throughout construction to notify them when and where work will happen, as well as what impacts to expect.  Please feel free to share this information with your neighbors and encourage them to sign up for project email updates [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/new?qsp=WASEATTLE_8 ].  

Construction updates 

*University District* 

*Location of Utilities* 

Before we continue with major construction, we are making sure we are aware of all utilities below the ground. To do this, we are excavating small holes in various locations throughout the University District. Once utility locations are verified, we will refill the holes. Work at each location should take approximately a day and we will notify nearby businesses and homeowners in advance of the work. 

*Eastlake* 

*Storm Water Upgrades at Fuhrman Ave E and Eastlake Ave E *

The RapidRide J Line project includes a lot of infrastructure upgrades aimed at community improvement, including water main work, enhanced lighting, road replacement, and upgrades to sidewalks, curb ramps, and storm water systems. 

We'll begin some storm water drainage improvements at the intersection of Fuhrman Ave E and Eastlake Ave E. This work will require the closure of some parking spaces and the pedestrian crossings on the east and south sides of the intersection. This work will also require the short-term closure of the bike lane, shifting bikes into general purpose travel lanes.

*Northbound Detour at E Allison St *

People travelling should be aware of route changes during RapidRide J Line construction. During planning and design, we heard from the community that it was important to protect the median trees on Eastlake Ave E near the I-5 ship canal bridge. To protect the trees and give crews enough room to complete their work, northbound Eastlake Ave E drivers and buses will detour around one block using E Allison St and Harvard Ave E. Temporary signal modifications will be installed at the Allison/Harvard intersection to facilitate bus and vehicle traffic using the detour route. 

The current bus stop on Eastlake Ave E will be temporarily relocated to Harvard Ave E during this detour.  

Construction crews will build a new driveway for drivers going to and from the paid parking area beneath I-5 from Harvard Ave E. 

While the detour is in place, crews will replace utilities, resurface the road, and install new protected bike lanes and elements of the RapidRide bus service, such as new bus shelters. 

Map showing detour on E Allison Street

Northbound Eastlake Ave E drivers and buses will detour around one block using E Allison St and Harvard Ave E.

*Construction has started on Eastlake Ave E *

Earlier this week, crews closed all on-street parking between E Lynn St and E Galer St as part of the RapidRide J Line project. Construction crews will be working on utilities beneath the road and will need to shift traffic away from work. At least one lane of traffic will be maintained in each direction through the project. The load zone on Eastlake Ave E just south of E Blaine St will be relocated to E Blaine St. You can review the final design on our project website.  

*What to expect during construction * 


* Typical construction hours are weekdays, 7 AM to 5PM, with occasional weekend and night work 

* Heavy equipment in operation such as concrete saws, concrete breakers, excavators and other trucks 

* Occasional traffic delays while crews set up barriers and other traffic control devices  

*Stormwater work and road closure at E Garfield St *

To allow for storm drainage upgrades, crews have closed E Garfield St and it will remain closed for approximately three weeks. During this period, we are working closely with local business owners to ensure minimal disruption, and we will maintain access to parking areas throughout the construction phase. Once the work at E Garfield St is complete, the stormwater work will move south along Eastlake Ave E to E Galer St and then north to E Lynn St. In the coming weeks we will share more updates about the timing of this work. Your understanding and cooperation are greatly appreciated as we work to improve the infrastructure in our community. 

Map showing E Garfield St closure between Fairview Ave E and Eastlake Ave E

E Garfield St will be closed between Fairview Ave E and Eastlake AVe E

*South Lake Union* 

*Contractor closed Fairview Ave N parking stalls, vehicle circulation to remain open * 

Earlier this month crews closed the parking stalls on the frontage road that runs parallel with Fairview Ave N between Aloha St and Valley St as part of the RapidRide J Line project. The current southbound lane of the frontage road will remain open to traffic during construction. Contractors will use the parking area for staging construction equipment and materials. This area will eventually be part of the project to widen the road to accommodate an additional lane for buses and a mixed-use pathway. You can review the final design on our project website

*What to expect during construction * 


* Typical construction hours are weekdays, 7 AM to 5 PM, with occasional weekend and night work  

* Occasional traffic delays while crews set up barriers and fencing  
Map showing parking closure on Fairview Ave N between Aloha St and Valley St

Parking is closed on Fairview Ave N between Aloha St and Valley St

*Project background* 

The RapidRide J Line upgrades King County Metro’s Route 70 with an improved RapidRide level of service. The project will enhance bus speed, access, reliability, and station amenities. It will also install protected bike lanes, a new watermain and paving on Eastlake Ave E, and bring many more upgrades as it connects Downtown Seattle with the neighborhoods of Belltown, South Lake Union, Eastlake, and the University District.   

*How to Stay Informed*  

To ensure you're informed of the latest updates and developments on the RapidRide J Line project, we encourage you to sign up for our project emails. This will give you detailed information about construction activities, timelines, and any changes that may affect your neighborhood. Please feel free to share the details of our website and project emails with friends, family, or anyone who might be interested in knowing more about this exciting initiative. You can sign up for the emails and find more information on our project website [ https://us-west-2.protection.sophos.com/?d=govdelivery.com&h=6c4b49d7a3fb4ef6b3ebeebf020de3e1&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzdk&p=m&s=AVNPUEhUT0NFTkNSWVBUSVbl_TJuflgMLM9sNZKcSEw1ELJw3erXr5XRR3GLgMEGjw&t=MVFGc2c2MnZYUjNjRG5TQUdCS3Bya0ExYzFza1R5WFRHY3dYQjhYaXo4UT0%3D&u=aHR0cHM6Ly9saW5rcy0xLmdvdmRlbGl2ZXJ5LmNvbS9DTDAvaHR0cHM6JTJGJTJGd3d3LnNlYXR0bGUuZ292JTJGdHJhbnNwb3J0YXRpb24lMkZwcm9qZWN0cy1hbmQtcHJvZ3JhbXMlMkZwcm9ncmFtcyUyRnRyYW5zaXQtcHJvZ3JhbSUyRnRyYW5zaXQtcGx1cy1tdWx0aW1vZGFsLWNvcnJpZG9yLXByb2dyYW0lMkZyYXBpZHJpZGUtcm9vc2V2ZWx0JTNGdXRtX21lZGl1bT1lbWFpbCUyNnV0bV9zb3VyY2U9Z292ZGVsaXZlcnkvMi8wMTAwMDE5MjcyYmVmM2RkLWIyZDA1ZWVmLTgzNDItNDk0ZC1iNzZlLWI3YTc5OWYwM2YwYS0wMDAwMDAvcmtEZUhUZzA5VTZJT1JsTHhhdEJnbmFOc1FyV2VMckh4QTJ1MzBvOW0xVT0zNzQ%3D&utm_medium=email&utm_source=govdelivery ]. Thank you for your continued support and engagement!  

*Contact us** *    

If you have any questions, please contact us at RapidRide@seattle.gov.       

Sincerely,     

Darrell Bulmer    

Communications and Outreach Lead    

RapidRide@seattle.gov | (206) 257-2022   

*Need Translation?*   

For information on our work to upgrade the Route 70 bus route to a RapidRide bus line, in your language, please leave a voicemail in your preferred language at (206) 257-2202  

Para obtener información en su idioma sobre nuestro trabajo para convertir la Ruta 70 del autobús a una línea RapidRide, llame al (206) 257-2202  

若想通過您的語言了解有關 70 號公車路線升級為快速線 (RapidRide) 的工程資訊,請致電 (206) 257-2202  

若想通过您的语言了解有关 70 号公交路线升级为快速线 (RapidRide) 的工程信息,请致电 (206) 257-2202  

70번 버스 노선을 RapidRide 노선으로 업그레이드하기 위한 당국의 작업에 대한 정보를 귀하의 언어로 확인하려면 (206) 257‑2202로 전화하십시오  

Route للحصول على المعلومات حول عملنا لتطوير مسار الحافلة 70   

(206) 257-2022 بلغتك، اتصل بالرق م  RapidRide إلى خ ط  

Visit our webpage [ https://www.seattle.gov/transportation/projects-and-programs/programs/transit-program/transit-plus-multimodal-corridor-program/rapidride-roosevelt?utm_medium=email&utm_source=govdelivery ]





*Seattle City Hall*

600 4th Avenue

Seattle, WA 98104

*Phone: 206-684-2489 (CITY)*

facebook [ https://www.facebook.com/cityofseattlegov/?utm_medium=email&utm_source=govdelivery ]twitter [ https://twitter.com/cityofseattle?utm_medium=email&utm_source=govdelivery ]instagram [ https://www.instagram.com/cityofseattlegov/?utm_medium=email&utm_source=govdelivery ] [ https://twitter.com/cityofseattle?utm_medium=email&utm_source=govdelivery ] seattle dot gov

Manage Preferences [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/edit?preferences=true#tab1 ]  |  Unsubscribe [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/one_click_unsubscribe?verification=5.7e4abd93610d77ba0dce3e5196581a5c&destination=mshinji3056%40gmail.com ]  |  Contact Us [ http://www.seattle.gov/customerservice/contact.htm?utm_medium=email&utm_source=govdelivery ]  |  Help [ https://subscriberhelp.govdelivery.com/ ] |  Privacy [ https://www.seattle.gov/privacy-statement?utm_medium=email&utm_source=govdelivery ]




________________________________________________________________________

This email was sent to mshinji3056@gmail.com using GovDelivery Communications Cloud on behalf of: City of Seattle, Washington · 707 17th St, Suite 4000 · Denver, CO 80202 GovDelivery logo [ https://subscriberhelp.granicus.com/?utm_medium=email&utm_source=govdelivery ]

body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;}
  • [登録者]City of Seattle
  • [言語]日本語
  • [エリア]Seattle, WA
  • 登録日 : 2024/10/18
  • 掲載日 : 2024/10/18
  • 変更日 : 2024/10/18
  • 総閲覧数 : 35 人
Web Access No.2250651